Floors That Stay Level and Look Consistent

Flooring installation and replacement in Austin and surrounding areas for homes that need durable, properly prepared surfaces.

When you notice gaps opening between floorboards, tiles that rock underfoot, or laminate planks that have started to buckle near doorways, the problem often starts with the subfloor rather than the finish material. Floors installed over uneven or damaged subflooring will shift, crack, or separate no matter how carefully the surface layer is laid. RRR Builds handles flooring installation in Kyle by preparing the subfloor first, removing old materials that no longer sit flat, and installing hardwood, laminate, vinyl, or tile that stays level and aligned across rooms.

This service includes subfloor repair or replacement, removal of existing flooring materials, and installation of new flooring in hardwood, engineered wood, laminate, luxury vinyl plank, or tile. Work covers both residential remodels and new builds, with attention to how the floor transitions between rooms, meets baseboards, and handles expansion or contraction as temperature and humidity change throughout the year.

If your Kyle home has flooring that no longer lies flat or you are planning a remodel that requires new materials, contact us to discuss what installation involves and how the finished floor will hold up under daily use.

How proper preparation changes the finished result

Installation begins by removing the old flooring and inspecting the subfloor for damage, unevenness, or soft spots caused by water exposure or improper support. In Kyle, homes with concrete slabs may need crack repair or self-leveling compound before flooring goes down, while homes with wood subfloors may need new plywood sections or additional screws to eliminate squeaks and flex. RRR Builds levels and secures the subfloor before any finish material is installed, ensuring that planks or tiles sit flat and do not shift after the work is complete.

Once the subfloor is ready, hardwood is nailed or stapled in place, laminate and vinyl click together with underlayment beneath, and tile is set in thin-set mortar with spacers to maintain consistent grout lines. You will notice that the floor feels solid when you walk across it, planks or tiles meet evenly without lips or dips, and transitions between rooms are flush rather than creating a tripping hazard. Baseboards are reinstalled or replaced to cover expansion gaps, and the finished surface requires no immediate touch-ups or adjustments.

The timeline depends on the size of the area and the type of flooring being installed. Most installations take between two and five days, though larger spaces or homes that need extensive subfloor repair may take longer. This service includes removal and disposal of old flooring but does not cover furniture moving or storage, which must be arranged separately.

Homeowners usually ask about materials and timing

Questions about which flooring materials last longest, how subfloor issues affect the finished result, and how soon the floor can be used after installation come up regularly in Kyle.

What flooring material holds up best in high-traffic areas?
Luxury vinyl plank and porcelain tile are both highly resistant to scratches, dents, and water damage, making them good choices for entryways, kitchens, and hallways. Hardwood is more susceptible to surface scratches but can be refinished multiple times, while laminate cannot be sanded down once it is damaged.
How do you fix a subfloor that is not level?
RRR Builds uses self-leveling compound on concrete slabs to fill low spots and create a flat surface, while wood subfloors are shimmed, sanded, or replaced depending on the severity of the unevenness. A level subfloor prevents tiles from cracking and planks from gapping after installation.
Can new flooring be installed over existing tile or hardwood?
New flooring can sometimes be installed over old materials if the surface is level, firmly attached, and free of damage. However, removing the old flooring allows for subfloor inspection and repair, which prevents future issues and ensures the new material sits flat.
How long does hardwood flooring take to install?
Hardwood installation typically takes two to four days for an average-sized room, including subfloor preparation and baseboard reinstallation. The wood must acclimate to the home's humidity level for a few days before installation to prevent warping or gapping after it is nailed down.
What happens if the subfloor has water damage?
Water-damaged sections of the subfloor are cut out and replaced with new plywood or cement board before any flooring is installed. If the joists beneath are also damaged, those are reinforced or replaced to ensure the floor does not sag or bounce after the new material is laid.

RRR Builds installs flooring in Kyle with attention to subfloor preparation, material selection, and how the finished surface transitions between rooms. If your floors are worn, uneven, or showing signs of subfloor damage, reach out to schedule an evaluation and go over what replacement will involve.